1300 364 858

Whole of House Installation of Filter and UV kits

In the following series of videos, we break down the installation process for Whole of House (WoH) Filter and Ultraviolet (UV) kits.

The steps include:

  1. Unpacking the kit – checking you have all the items required
  2. Preparation for the job. Assembling the kit
  3. Positioning the unit
    1. Water pressure
    2. Valves
    3. Fixtures
  4. Installation
  5. Test and checking

 

Step 1: Unpacking checking the kit

Step 2: Preparation for the job. Assembling the kit

Step 3: Positioning the unit

  1. Water pressure
  2. Valves
  3. Fixtures

Step 4: Installation